Direct answer: compare the accepted first-order quotation with the new reorder quotation on the same specification, quantity, packaging and delivery scope. Ask the supplier to identify what changed and which costs the new price includes. Then update your own cost and inventory decision before accepting. This is a repeat-order review, not guidance about a supplier demanding extra payment on an already accepted order.

Recover the actual first-order baseline
A product may sell successfully before the next quotation arrives at a higher price. The first step is to retrieve the accepted quote and order record, rather than relying on the headline unit price remembered from a message.
Keep the product version, variant quantities, included accessories, packaging and separately quoted work visible. Note any one-time sample, setup or promotional arrangement that was part of the earlier order. Do not assume the original terms automatically repeat, and do not assume every price difference reflects a changed product cost.
Compare the two quotations line by line
Use this blank comparison structure. Actual answers should come from the supplier and your own records, not from a generic explanation of factory economics.
| Input | Old and new references | Question to resolve |
|---|---|---|
| Product specification | Model, material, dimensions and agreed function | Is the offered product unchanged? |
| Order mix | Total quantity and units per variant | Did the mix or production arrangement change? |
| Accessories / packaging | Included components and packaging versions | Is the scope equivalent? |
| One-time work | Sample, setup, tooling or file preparation charges | Which items recur, and why? |
| Checks / handling | Agreed evidence and warehouse actions | Is work now included or excluded? |
| Transport / payment | Quoted route, currency, validity and payment scope | Are both prices on the same basis? |
Ask the supplier to explain the change specifically
Ask which inputs changed, whether the explanation applies to the same model and when the new quotation expires. If the supplier attributes the difference to material, setup, order mix or another factor, request a clear explanation connected to your order. Treat it as a statement to evaluate, not as independently verified market data.
A useful question is: “Please identify the differences between quotation A and quotation B for this model, including specifications, quantity mix, packaging, included work and delivery scope.” That is more actionable than asking only why everything became expensive.
Keep substitutions separate from the price discussion
A supplier may offer a cheaper material, accessory or packaging option to restore the previous unit price. Record the alternative explicitly. Do not treat a familiar price as proof that the repeat product is unchanged.
Use the sample-to-production comparison guide when the proposed configuration differs from the reference you approved. A supplier’s proposed change may require another sample or an appropriate technical review before it can support the same customer-facing claims.
Recalculate your purchasing decision
Update the complete order cost using the actual new quotation and the costs that remain separate. Review how the quantity mix fits demand evidence and available cash. A previously viable product may need a different order mix, selling plan or pause; the earlier sales result alone does not answer that decision.
The landed-cost sheet guide provides an input framework. Do not change customer prices, taxes or import assumptions based on an incomplete supplier figure. Obtain appropriate professional advice for financial or regulatory decisions.
Compare alternatives without losing the baseline
If you seek another supplier, give it the same defined requirements. A lower quote from an untested source can introduce sample, quality and transition questions. Use the second-supplier check and the quotation comparison framework before treating the alternative as interchangeable.
This page concerns a price change from the existing supplier for a new order. It does not replace the wider supplier comparison process or determine whether any party has breached an earlier agreement.
Choose an explicit next step
- Clarify when specifications or inclusions differ or are missing.
- Request a revised quote when an agreed change needs a new price and scope.
- Evaluate an alternative when you need a credible second option.
- Approve or pause after the new commitment fits your evidence and constraints.
Keep the accepted new quotation with the model, packaging and quantity references. Record anything that remains conditional. A clear new baseline makes the following reorder easier to assess.
Clarify a repeat-order comparison
If useful, send a product link or short description, target quantity, destination country and business email. These four basics help frame supplier and quotation questions. Review sourcing coordination; included work and responsibilities need an agreed scope.
Frequently asked questions
Should a reorder always keep the first price?
Do not assume so. Review the accepted terms and the actual new offer. Ask what changed before deciding whether to proceed.
Should I order more to reduce the unit price?
Only if the larger commitment fits demand, cash and operational evidence. A lower unit price does not automatically justify more inventory.
Can I accept a cheaper substitute to preserve margin?
Evaluate the exact change first. Confirm its implications for function, quality, claims and required review rather than silently replacing the approved baseline.
What if a paid order is being repriced?
That is a different situation. Review the actual agreement and seek appropriate advice; this article addresses quotation comparison before accepting a repeat order.
See pricing and scope, the FAQ and contact options for general sourcing questions.